Another Matter – Harpers Field

Restoration



by: Andy P.

A different assignment as we loaded up to go to Harpers field to help with excavating the entrance and adding type 1. Also on the agenda was to fit a very long gate and realign the fence panels.

The top surface was scraped away with the mini digger, transferred to the tipper and deposited in the field. A membrane fitted and type 1 added to the top. Think we will need a lot more of this to get up to the long gate.

A vehicle entrance and a pedestrian entrance were also assembled and moved twice so we could get it to fit in with the long gate.

The services trench will have to wait another day

Latest News