Another Matter – Harpers Field
Restoration

by: Andy P.
A different assignment as we loaded up to go to Harpers field to help with excavating the entrance and adding type 1. Also on the agenda was to fit a very long gate and realign the fence panels.
The top surface was scraped away with the mini digger, transferred to the tipper and deposited in the field. A membrane fitted and type 1 added to the top. Think we will need a lot more of this to get up to the long gate.
A vehicle entrance and a pedestrian entrance were also assembled and moved twice so we could get it to fit in with the long gate.
The services trench will have to wait another day




