Ham Mill weds March 6th 2019

by: Andy P.
6 people today Bob, Duncan, Richard, Mathew, Julian and Andy. First job was to empty the water filled trench then to start hand digging. Sounds easy-it is not. The evil sucking mud refuses to come out easily. Lift to wall, then carry to bucket, then carry to wheel barrow, then wheel uphill to canal. Repeat. Suck more water out. Repeat. Disc cutting bricks, hand chiselling bricks. Repeat.
Duncan dam builder made another beautiful looking crossing nearer to where we are working and a pipe fitted to allow flow between the 2 pounds. Bob designed and fitted a recyclable non return valve device as well. Very clever.
At the end of one of our most difficult days we are 1 pipe length from the end. Thought it would be easy when we reached the bottom. How badly wrong can you be? So vote of the day. Bob with the best lightly splattered face, Richard with the most splattered face, Duncan the cleanest and Julian (not in photo) for the longest trench time. Good job we can still smile.