The Canal IS Level.
by: Bob H.
Well, it may be so on the surface, but like the Duck on a fast-flowing stream, all is far from calm and level underneath.
One of our problems is that we don’t really know where the really shallow bits are or what volume of silt we have to remove. Enter a nifty bit of high tech kit.
Plotted and stored on the laptop, later analysis provides a detailed canal bed contour map and, based on a specified channel section, how much silt we need to remove by dredging.
Did I mention that it’s quick too?
Today, Mark (LSS), assisted by Bob and Alex (CCT dredging team) did a first pass of the survey from Wallbridge to Ryeford Top Lock. The little boat covered about 20km and made over 40,000 measurements of depth, on about 3km of canal.
Tomorrow we do a bit of follow-up on sections where trees stop the gps or the mobile signal don’t work because of overhanging trees and mobile dead spots. Thank you all boat crews and dredgers for suspending work tomorrow for a day (silt free water is needed). We’ll report later on the findings.
“May all your combined leaks never exceed your bilge pump capacity.



