The Cotswold Canals Restoration Project is breathing new life into this historic 36-mile waterway, reconnecting communities, habitats, and heritage. The project was divided into three phases (with Phase 1 split further into 1A and 1B) to help structure restoration and secure funding.

The first major funding breakthrough came in 2006, paving the way for the long-term revival of the canals – a project delivering environmental, cultural, and community benefits for generations to come.

Cotswold Canals Connected
Phase 1A: The Ocean to Thrupp / Brimscombe
Phase 1B: Saul Junction to The Ocean

Reopening the canal from Saul to Brimscombe, restoring locks, towpaths, and habitats along the route.

Phase 2: Spine Road Bridge to Inglesham
Extending the restored network to connect with the national canal system, boosting recreation, tourism, and biodiversity.

Phase 3: Brimscombe to Spine Road Bridge
Completing the full Cotswold Canals link, creating a continuous blue-green corridor from the River Severn to the River Thames.

The western section, from Brimscombe Port through Stroud, to Stonehouse.

PHASE 1B

The western section, from the Gloucester & Sharpness Canal to Stonehouse.

Bridge at Siddington

PHASE 2

The eastern section, from Cotswold Lakes to the Inglesham (Lechlade).

Sapperton Tunnel

PHASE 3

The middle-eastern section, from Brimscombe to the Cotswold Lakes.

Download the latest detailed
restoration Cotswold Canals Map.