All in the life of….

All in the life of the Dredger Team
by: Andrew R.
Dredger Trainee was set his final challenges starting at Ryeford landing stage.
February 11th, 8am, Blue sky, cold winds…
Trainee leading the day hoping to finally pass his WRG22b on Patricia.
After initial opening up and check procedures…
1 1/2 hours of Greasing the nipples, all 64 points on the jib/dipper/clam shell bucket (not easy and safety paramount) and 4 spud legs (easy on deck. Trouble is you are over water so safety harnesses used for some points in front of operators cabin.

So we set off and after very careful manoeuvring at Harper’s Field landing stage turning around a full 180, over silt that was touching the hull bottom (1 metre draft), we started to make our way.
We had to stop as the mobility canoes were moored double breasted and hopper offside, but a kind gentlemen washing down their vessels moved them so we could pass at deadslow!
Onwards, we approached the bypass bridge which is higher than other bridges on the canal only having to raise the dipper to clear the underside. So no complicated climbing to bow and removing safety jib latch to lower under bridge.
Onwards under slew bridge passed all the fallen/sawn down willow trees to Witcliff boat house. Alarm rings from engine room, “all spud legs down” came the cry from the instructor. Signals to crew to shut down engine. Another boil over of the engine coolant.
Problem solved with a top up. Near lunchtime so 2nd instructor said, “ I’m going to take the deck up and see why the bilge pump won’t turn off when on ‘Auto’. Trouble was deck screw ceased. Lubricant I here you say. A little more effort needed, heavy hammer and large screw driver and a tap here, a tap there and. screw finally gave in.
The heavy deck plate removed and a tight squeeze an instructor lowers himself into bilge, pulled the pipe and pump off. Took the basket off the pump and cleaned. Trialled it and after many tests concluded float switch operated below the impeller so would always stay on in auto. As a sealed unit only course of action is a new pump.
So let’s just check the other one someone said! This meant dismantling the welfare cabin steps, lift an inspection hatch and to our delight the internal bilge was bone dry.
Darn it! That instructor has taken over and something we all enjoy is digging up trophies!! He says, don’t know what I’ve got here but it’s not just reeds. Pulling on jib joy stick no lifting was happening. Let’s go try a shallower dig, slowly and surely an unusual large metal framework Appeared out of the reeds and silt. It was placed as far to bank as possible. Please look at photo and send your thoughts to us about what you think this did!! You might need to turn you head or phone upside down!

So on we go working on today’s final main task, dredging to bank through a reed bed. A new experience for the Trainee. The clouds came, the wind got stronger and cold, Snow or soft sleet was blown into operators cabin.
Finally made way back to Ryeford to finish at 4 pm.
A very good day and the Two instructors were very pleased with the trainee. What was good he had the range of experiences seen and unforeseen issues to solve which is NORMAL IN THE LIFE OF A DREDGING DAY and leaders need to make decisions.
This now means we need a new committed trainee or two who is willing to start at 8 am and do 7-8 hour days and commit to an intense training program over many hours. On Patricia initially.
If you are interested in dredging training. Please contact Andrew R and John S (dredging instructors)


