The Landing Stages team has spent the last few weeks on bank protection work.  There are two concrete plinths opposite each other at Ebley, and the banks each side have been undermining.  One of these spots (where the guys are standing, 1st pic) has received attention for leakage over the last few years.  The hole in the bank shows something needed to be done, before & after views. Obviously, about time for lunch, Mo .  .

The other three lengths were piled with about ten pieces each, and the tops joined with Armco on the land side, then backfilled with clay.  Now just awaiting the surface topping team.

Now under its own power with its new hydraulic prop, Samson was moved down to the bridge at Oil Mills.  The bank is steep and high by the NE abutment, and slipping into the canal.  Using the last of our supply of 5.8m piles (cut to 4.5m) we placed the first ten, and moved along to finish the last two.

The hammer has to be used on the piles in two stages, first down to frame top height, then with the frame off, down to the target height 1m above surface.

A bit of repositioning was needed due to rocks underground.  We’ll be back to complete the length when the new stock arrives, but for now, a cruise down through Ryeford Locks to Harpers field at Ryeford to build some more moorings at the west end.  There was a pause for dredging at what is known, increasingly aptly, as the Navy Yard.