Recently a small group of volunteers from Western Depot were invited to look at progress on the £25m sewage upgrade system being carried out by Galliford Try.  This comprises 3.5km of new (up to 1.5m diameter) sewage pipes to provide more capacity…. leading to the largest hole in Gloucestershire! 

This CSO  (combines sewer Overflow) holding  tank, some 25m in diameter and 28m deep, provides massive storage capacity during heavy rainfall. In the event of a storm surge, the stored liquid can be held (avoiding emergency discharge into the Frome) and then pumped through for normal processing to Stanley Downton Sewage Treatment works. 

The pipe network zigzags trough the town, crossing the canal and river Frome several times as the (4) laser guided Tunnel Boring machines can work over about 120m before a new access hole is required. In total 12 access holes were required. Special measures were taken to avoid subsidence from boring and monitoring was undertaken to check no significant (>1mm) changes in level after boring.

After commissioning the new pipes in late summer, GT will remove the old sewage pipe crossing the canal at Lower Wallbridge which impedes all but a few boats as well as the now redundant old CSO tank there.

The scheme has also included installing separate storm water pipes in the upper part of the town. The whole system can be monitored remotely and when competed in the Autumn, landscaping at the site on the Ebley By-pass will hide most of the installation from view.

Peter Richardson Senior Project Manager for the Galliford Try commented “I enjoyed today’s visit by CCT. It nice to show around people who are interested in construction and who appreciate the works we are doing”.  Following a visit to Western Depot earlier in the year, Galliford Try have been very supportive of donating surplus equipment to Cotswold Canals Trust.