‘Bob’, a Job

‘Bob’, a Job
by: Peter A.
Great progress with much achieved today. Our silicone sealant experiment to verify why water was finding its way in to the cabin through the sliding lid/doors proved conclusive following the weekends heavy rain. So, to engineer a permanent solution, two strips of weld were put on the roof to divert the water away from the entry points.

Inside, our depot chippies were soon hard at work repairing the damaged roof timbers and dressing other shabby bits around the boat. The greatest change happened when the new kitchen work surface was snugly fitted into place. They have also donated some tiles for a splash back around the sink and the cooker area.


Elsewhere, the upgrade to the electrics has commenced. The battery is being relocated to help with boat trim and the main isolating switch has been tidied up considerably. We still have the plumbing to do.
We now have all the paint on hand, the decorating task can start fairly soon now that the woodwork is almost complete. We wish to put a sliding window over one of the side doors for extra daylight. This is going to require a bit of serious joinery to achieve.
One slight concern is, if we do too good a job, someone will declare the boat as a ‘profit centre’ and we will have to sell it as a holiday let!