Today has been taken up with plumbing, both water and electrical.

The battery is now located at the bow end of the boat, with the battery box now fixed to the floor and a cable conduit run back to the main centre of activity, under the sink. The 12V wiring is almost complete.

With respect to matters water. The water pump, feeds to the water heater and the cold tap are now in place and tested. A new water feed follows the electrical path to the battery box, above which will be a water tank. We currently don’t have a tank, so, does anyone have a suitable container going spare between 25 & 50 litres?

The damp which had built up as a result of the water leaks from the roof is now rapidly drying out. We have had the heating running all the time we are aboard. In fact, the interior is pretty well ready for painting. Stocks are on hand.