‘Bob’, a Job

‘Bob’, a Job
by: Peter A.
With our contract to refloat Annette now completed, it was time to get back and attend to ‘Bob’
Out in the yard, around the scrap bins, has been a thin, square water tank taken out of the welfare unit in Harper’s Field. This, we determined, would fit behind the seating area at the bow end of the boat adding useful ballast to balance the heavy stern.
Some woodwork surgery was required to get the thing to drop in, but with a couple of floor supports it makes an ideal solution to our water supply having some 70 litres capacity. We will need to install a proper narrowboat water fill point in the bow gunwale. A few odd plumbing jobs were also completed.

The wonderful window frame, with its lift out window has been given a coat of varnish, together with other odd bits around the boat. A general tidy-up of materials and the replacement of things such as the internal doors, coat hangers, flame blanket, side steps etc, has given the interior a somewhat ‘completed’ look. Oh, not to forget the installation of a second hand ‘white’ board – with any references to jobs removed off it!

Elsewhere, the splashbacks for the sink and cooker are now in place and sealed. The stainless steel was recovered from the scrap bins having been extracted from one of the ice cream vans.

On Wednesday we will turn our attention to the gang plank assembly, a contraption which is still in the design fermentation stage.


