‘Bob’, a Job

Maintenance

‘Bob’, a Job

by: Peter A.

We’ve been working on, latterly described as, the ‘Diving Platform’

Utilising a couple of old hinge points at the stern, we have fabricated support brackets to take a planked ladder section, which is fold ‘downable’. Once down, not only does it significantly increase the rear landing stage, for safety, but also supports a second ladder section which can be used as a gang plank.

The second ladder section has the planks mounted on the underside of the ladder rungs, this provides good stepping points should the gang plank be at a steep angle, which it often is at some points along the towpath. It has a captive hinge arrangement to keep it locked to the platform section.

There remains some painting of these components to complete.

Elsewhere, a small cover that sits above the exhaust outlet of the generator, which had been knocked flat, was removed and re-welded on.

Inside, a magnetic latch for the inside doors has been fixed in place.

If the weather is good on Wednesday, we will hopefully complete all the painting jobs.

Latest News