The current locks on the Cotswold Canals are built of many courses of brick with lime mortar, almost certainly locally manufactured. The number of courses is at least 4 wide, with buttresses in between and particularly at the lock gates to provide support.

John Robinson Lock, where courses and buttresses clearly visible.
As part of Phase 1B, two brand new locks need to be built and with limited cash a major concern, a range of alternative construction approaches are being considered and in particular, those methods that could be built by Volunteers.
One of these involves using STEPOC interlocking concrete blocks, which are tied together with vertical and horizontal rebar…and to avoid potential future corrosion from the usual steel rebar the proposed reinforcement bars are a mix of resin and crushed basalt. The intermediate space in the block is filled with a concrete mix and tamped to ensure all the voids are filled.

A trial section of wall has been built at Western Depot to assess the method and learn more about construction techniques. Help from the suppliers Ibstock has been provided to the design and project teams
A concrete base was built and precut lengths of rebar inserted in holes drilled in the base using the recommended spacing and secured with epoxy resin.
Blocks were carefully lowered over the protruding rebar and aligned. One problem was that small bits of grit from the blocks needed to be removed or the wall soon got out of alignment. The vertical rods were “tied” into horizontal bars using wire loops a twisting tool. (Steel rebar is being used for the trial).

The voids were next filled with a concrete mix, concrete samples were taken for 7 day and 28 day testing. The C30 mix of cement, sand and gravel should withstand 30 newtons compression after 28 days.

The sloppiness of the concrete is also important to ensure voids are filled. This is checked with a “slump” test where an inverted cone of concrete is allowed to slump and the change in height of the cone measured after an interval.

The lower wall was easier to fill with concrete and to tamp down with a vibrating poker. This ensured that the concrete filled the voids…but had the effect of pushing out the end block of the wall! Another learning point.

Next stages are to evaluate the trial for wall strength, effectiveness, ease of construction, cost etc. Detailed wall and rebar design now under consideration. This includes taking cores of the wall to check the concrete fill and considering scaffolding needs, block handling and construction environment.

The design of the lock gate ends to provide the requisite slope (2 degree), strength and stability is also critical.