Clearing the Field

Maintenance
Restoration

Clearing the Field

by: Will F.

Due to the owner’s request, we have had to clear “Prentice Field” of our equipment and building materials. An audit was first done to identify what we had and where it might go, then get on with moving it!

First to go was the restored dredger “Hamster”. 

Then we had to shrink wrap more than 80 loads of bricks and stone acquired for lock repairs…many had to be re-stacked on pallets. The hire of a Telehandler, enabled us to load the pallets onto a flat-bed truck which transported them to a nearby SDC site at the “Weighbridge”. 

Next came the 5 steel containers which contain our scaffolding poles, clips and boards, lock penstock parts, ladders and other essential items for canal restoration.  The containers were loaded with a Hiab equipped lorry and transported to our site at Harpers Field (with the owners permission).  Most of the contents survived intact! 

Having to clear the site has allowed us do some tidy up work; so far we have filled 2 skips, sent 4 loads for steel recycling, sold a trailer, sorted loads of scrap wood, got a deal to recycle the over 20 tyres retrieved from the canal…

Our stock of road and towpath signs have been moved to our Hoggs Meadow site along with some other items. We have also moved much of the spare lengths of wood and pipes held on a storage rack, this is now being reassembled at Harpers Field.

The Heras fencing has been installed along the canal at Fromebridge and other canal work sites. The Stop planks have been installed on their (new) shelter at Pike Lock, and next week in the canal at Dock Lock. 

We have started grubbing up the hard core that we laid to stabilise the field surface, this will be used for making a ramp so we can access Dock Lock for renovation work

Good progress made…, with a some remaining items to go…anybody need a towable  Ice-cream van?