Ocean Silt Gets Cleared – Slowly

Phase 1B
Restoration

Ocean Silt Gets Cleared – Slowly

by: Buffs.

After the hectic start to dredging of the Ocean reported in earlier posts on this Blog things have settled down to a more measured pace.

There is visible progress in the dredging of a channel and general deepening of the Ocean. Relieving the basin of the very heavy silt accumulation of the nearly 70 years since the rail bridge was strengthened and the waterway reduced to a narrow portal at the centre of the waterway will take some time.

The two dredgers, Patricia and Augustus Gloop, are working their way along the towpath side of the basin clearing the foot of the bank wall so that boats can be moored without becoming grounded.

Before the wall could be dredged a channel had to be cut from the newly cleared Bridge pass to at least the mid-length of the Ocean channel.  Some of the dredgings were simply moved towards the off bank to be cleared later. This process was used successfully above Bowbridge lock. In some places the extensive network of lily roots have been piled so high that they can be seen well above the water level.

In the photo taken on Wednesday 27 April one hopper is being filled by Patricia, a second, full hopper, awaits a tow to Harper’s field for discharging. This second hopper looks a little grounded but will be pumped and towed by one of the tugs. Augustus Gloop is working closer to the new bridge. At this point the dredging limit is about one metre from the bank. Here the bank is retained by elm planking which has been in place for many decades. The planking is normally unseen under the water but was exposed to the air when the Ocean was drained for the bridge works. The planks have dried – not to a significant extent we believe – and will need some time to rehydrate and take their rightful place in the bank.

The wide beam barge Delilah has carried a large quantity of stone chippings and ballast for the towpath reconstruction and is acting as the headquarters for the team working on the path. Now that she has discharged her heavy cargo she rides high in the water.

The bridge is now being opened with some ease by the boat crews as they pass into and away from the Ocean. The continual operation of the bridge has cleared the sclerosis of the hydraulic pipework and improved the cardio vascular fitness of the volunteers. Times to open and close the bridge have reduced to a more acceptable level. Liaison with our neighbours has also improved.      