Digging for Gold

Maintenance

Digging for Gold

By: Buffs

The exceptional and localised heavy rain of last week disrupted the normally smooth running of Western Depot on Monday. The digger was locked away at the back of the yard hemmed in by our trucks and van and by the Godwin pump from Annette II which had usurped the digger from the comfort of it’s trailer. The carpark was closed except to the early birds who opened up the Depot. The tasks for the day were already up on the board they listed the targets for today. Desilt the pump which had had been on a crash diet of silt and bloated itself by about 600kg. Clear Dudbridge grille of the huge accumulation of debris brought down into the cut by the torrents running off the hills. Check the groundhog for water damage as the tide mark at Dudbridge lower lock was at least 18 inches above the lock walls and ringed the steel shell of the unit.


Weedy’s crew were also in the yard to collect and reassemble their steering gear and take it to the boat at Harper’s field. Hydraulic Arthur (ATH Hydraulics) had returned the resealed cylinder last week. The only unknown was where the bolts to reattach the assembly to the boat – it has been some weeks since the bolts were put in a safe place.. somewhere.

Before any vehicles could be sent on their way the digger trailer had to be manoeuvred to the top of the carpark, close to the canal ensuring the shortest journey to the canal to redeposit some of the 600kg of wet lodged inside the housing into the water. Then there was the usual bomb burst of volunteers and kit to the work sites. A gentle quiet descended. The gentle swish of paint brushes applying a second coat to BOB competed with the early quiet breeze by the canal.

Once the doors of the pump were opened the extent of the accumulation of silt was revealed. Every surface was laden with silt. It was piled up against the doors in a solid mass two hands high and was level across the enclosed space. Every nook and cranny was rammed. Somewhere in this mass was an engine and a hydraulic pump. The vista was not unexpected considering the pump had been fully immersed in the canal at a time of very high to exceptional flows with the runoff from the hills around Stroud depositing a thick layer of fine silt over the canal bed. Pre-Christmas trial swings of the gates at the upper Dudbridge lock were difficult with the cause considered to be the build-up of silt on the upstream side. The Flood gates at Ebley are expected to be similarly fouled.

Bricklayer’s trowels and buckets were brought to the pump and silt slices were cut and served. The consistency was likened to a very thick blancmange but much heavier. Slice by slice the top layers of silt were cut away into the waiting buckets which were soon filled. The contents were soon returned to the water below Pike Bridge. Several trips to the bridge were made with ever fuller and heavier buckets. As the upper levels of silt were removed it was possible to discern strata of different colour material which may indicate the several extreme rainfall events around Christmas and the varying sources of origin for the silt. Digging deeper into the engine bay the solid mass became more and more mobile passing through a mousse stage to a good homemade tomato soup consistency. At this point trowelling out became a slow and ineffective means of desilting especially as the pump sits in a bunded housing. A different method was required.

Taking advantage of the homogenous nature of the silt particle sizes adding water to the mix to produce a slurry gave a pumpable consistency. Spraying down the newly exposed surfaces to wash off the remaining silt into the bund filling it. Using a 38mm reinforced hose as a siphon the slurry was drawn from the bund onto the carpark surface. And No, there isn’t a superhuman pair of lungs at the depot to draw the water into the hose to start the siphon. More practically, the 3m long siphon hose was filled with water from the garden hose and when properly full one end was placed in the bund and the other on the ground. Sometimes the old ways are the best. Much more silt was extracted this way over several cycles of cleaning, filling and siphoning. As it came close to calling stumps the trailer was drawn back into the yard and the pump was unloaded and placed on the ground with one end raised on a piece of sleeper and the plug on the bund was removed. The flow of silt was resumed. It is estimated that between 300 and 400 kilos of silt and water were removed with more known to be hiding in less accessible places within the structure of the enclosure.

There remains much work to be done to ensure that the unit has not been unduly perturbed by it’s immersion but the early omens are good. More reports as we progress through the procedure.