Dudbridge Hydro Bund

Maintenance

Dudbridge Hydro Bund

by: Andy P.

During extremely heavy rain the lock overflows and water runs over the sides and towpath. The most recent torrent came a few inches below the mains electricity in feed to the hydro plant which also supplies parts of Cainscross.

Therefore discussions were held with Western power, but the cost to move the electricity supply cabinet to higher ground was very expensive. Therefore, a bund was designed and agreed, as a method to stop water getting where it shouldn’t.

This involved new steps, building a bund to incorporate the cabinet, installing a bund drain pipe and just for a change a lot of concrete.

The refitted and repaired tool store was loaded and brought down the tow path and chained and locked to the paddle gear. Materials and barriers were bought and collected by John’s team. Sand from Brimscombe was shovelled onto a truck and shovelled into bags. Everything had to be moved by hand over the fence or along the lock gates.

‘Bob’ the facilities boat was delivered by the boat crew. Tea, coffee, sugar and cups were rescued and returned to ‘Bob’.

 Bob the boss with Matthew, Bob the builder, Richard, Maurice, Alan and Keith T, gradually came back to work covering different days. Peter A came and fixed ‘Bob’ the boats electrics so we could boil the kettle-thank you.

 Over the following weeks the steps, wall, drainage system and concrete all came together.

 All the kit and surplus material had to be hand balled and delivered back to their various homes. A job that hopefully will never be used.