Dudbridge Locks

Maintenance

Dudbridge Locks

by: Chris K.

Dispite valiant efforts this week the Boat team failed to get both Dudbridge locks open to navigation. 

Upper Lock

We used Jasper to hand dredge with keps behind the upper lock gates. We have 3 gates fully open and the 4th gate almost fully open. We ran out of time and went to help raise the stop planks on the lower lock. But the silt got the better of dredger Patrica at Ebley so we called it a day. Hopefully Monday morning we will be more successful. 

Stop planks lower lock

Bob Amburys team said goodbye to Dudbridge locks and the boat team will do the tidy up dredging and removal of rubbish by hoppers. 