Dudbridge Lower Lock update

Dudbridge Lower Lock update
by: Andy P.
Dudbridge Lock Update July 27th
Vince and crew arrived with vehicle and battered trailer to take the scaffolding away. It took a lot of trips so thanks for the help.

Bob set about cutting out the submersible pump that had been donated by Stroud Metal Co. It took everyone’s effort to lift it out, so it could be sent to the depot so see if it was worth the effort-does look in a sad state though.


Tony J and Ollie joined us to seal the top gates using the ancient rope trick of stuffing rope in the gap. There were a lot of gaps but they had to return on Tuesday to complete the job. It was much better but still lots of leaks from the base which will reduce as the wood swells. The corner stones also leak.

The 6 stop planks were lifted out and dragged to the boat loading point and the back of the gates flooded. The lower stop blanks were left to the boat crew for Monday, as they were far too awkward to get at.
The tool store, which had served us very well, was made ready and loaded-well pushed onto the super new trailer and truck-very nice they were to. The store was returned to the depot for remedial work-a new axle and stands being the main things.


Work continued on the submersible pump wooden guard rails. These were extremely difficult to remove and resisted all cutting, hitting, wrecking bars and anything else we could think of. The posts were well fixed. Eventually out they came. Apologies to the boat crew as the large posts were just too heavy to lift from Aquila.