Dudbridge Lower Lock Update

Dudbridge Lower Lock – Update 24/06
by: Andy P.
Dudbridge lock June 24th update
The coping stones were as expected very heavy and for some reason not where you think they should have come from. Logic would suggest numbering as they were taken off. Therefore, we were left trying to guess. Using ancient Egyptian techniques the stones were dragged, rolled, pushed and heaved onto the tops and then cautiously dropped onto the brickwork. The spirit level never being used so much. Lots of packing needed to get things square-enough.
Even when the L shaped lock ladder was in place we still had to cut most stones to at least take a bit of weight off. What was amazing was the smaller stones to the left were placed and there was still a 400mm gap. Why? Have they shrunk in the heat? A trip to Brimscombe and 2 larger stones were collected and squeezed under the fence and into place. Much better job.
The downside was the ladder bolts didn’t line up. Everyone had to be drilled and resin fixed in place. A job that needed to be very quick and slick in order to set the bolts before the heat set the resin in the tube.
At long last the second to last stone was fixed into place. Just the one in the lock to go.



The submersible pumps has worked tirelessly for weeks, keeping the water level down. However, it now has issues and it cannot keep up with the water leaking into the lock. Our 3 fishy friends and 4 little ones, I am sure are very pleased with all the extra liquid.

We had a quick look at the wall on the tow path side. Not so good as bricks just fell out to reveal some big gaps at the back. Further down, at water level, some stone is very poor and will need some fixing as well.

We might be here for a few more weeks but super progress has been made thanks to everyone’s efforts and a 3 day week.