Dudbridge Stop Planks again!

Maintenance

Dudbridge Stop Planks again!

by: Dave I.

Before last week, there was a little confusion. Some folks thought the bottom stop planks at Dudbridge lower lock were in place and sealed. And some didn’t. It all became rather academic after last Thursday evening’s rain – they definitely were in (but not in the right place), but they definitely weren’t sealed.


So Patricia ventured forth, and with her 3 trusty crew put them back again. Some extra plastic was added on the high water side (facing away from the lock) to try to limit leaks between the planks, with bits extending sideways and down to try to limit leaks around and under the planks. With the big pump running, the water level was definitely going down: only time will tell how far, so all fingers crossed, please. 


If it all works as hoped, we will have dry(-ish) access to inside the lock. Unlike the damage caused to the lock by floods a few years ago, Thursday’s flood left the lock itself unharmed, so the masonry team still need to remove the remaining brick facing themselves.

Latest News