Dudbridge Stop Planks
Maintenance

Dudbridge Stop Planks
by: Andrew R.
Stop planks at Dudbridge set after many points of view and efforts.
The combined efforts of Dredger and Tug crews +1 general volunteer made JP very happy as with team work we reset the stop planks.

Patricia, Margaret and Aquilla tried a new technique to pass by Annette2 whilst there was a strong current from the hydro bypass pushing hard. We set to.

The yellow boom at Hilly Orchard Bridge, near Wiggles Yard, had collected rubbish, twigs, logs, balls, a vessels walking plank, and much more.

Pump left going and when I got back at 4pm it was good to see the level had dropped 6 1/2 planks in the lock.
A good day’s work, Jon P is so glad it’s finally done.