East End Activities

Events
Maintenance
Phase 2

East End Activities

by: Stuart H.

Siddington – Monday 20 Sept

This week it was the stretch from Siddington to the River Churn which got the pre-winter trim, it’s the third visit this year trying to keep the vegetation in check. One of the drawbacks of keeping the towpath clear is that it exposes just how much work will be required to get the stretch back into water.

Strimming in progress at Siddington – What3Words: fortnight.ports.carefully

Just before the site of the River Churn Aqueduct, there is an occupation bridge, originally a swing bridge, the abutments are still in place and rickety bridge crosses the canal so that the sheep can wander over without getting wet feet.

The swing bridge – What3Words: iceberg.creamed.dusters

There’s also a double barrelled siphon culvert between the bridge and the aqueduct, it was to allow flooding of the land each winter when the River Churn overtopped its banks. An 1800’s map of the area shows the Churn meandering south while the canal runs in straight line from Cowground Bridge to the River.

Map showing Cowground to the River Churn – © Ordnance Survey
The water level in the River Churn is a bit low

Over the years the last few yards of the canal bank have been grazed and this has suppressed a lot of tree growth, it makes a change to have an open stretch.

Swing bridge to the Churn Aqueduct

No blog covering this stretch would be complete without a view of Cowground Bridge. Significant repair work on the bridge was complete around 6 years ago. All the materials were wheelbarrowed down the towpath from Siddington – that’s dedication! 

Cowground Bridge (in 2030?)

Eastern Depot – Tuesday and Thursday, 21 – 23 Sept

The main activity is still log production with distribution starting to take up more of the available time . That said, on Tuesday Rob and Doug had another diversion, they had to pop out to Wildmoorway lock as someone had reported that there was a hole in the top of the lock that looked to be a bit of a hazard. With a barrow of concreting ballast loaded into the van and the problem was soon sorted

Wildmoorway Lock, jack post hole open (Image Robert Lindsay)
Hole backfilled to protect the public (Image Robert Lindsay)

The yard is starting to look quite bare now that most of the timber stacks have been processed, the complete stock of raw material may well be exhausted in the next week.

Eastern Depot at the start of this week

A pile of sawdust has mysteriously appeared in the yard, the team are treating it as a roundabout

Waste product from log production, along with an emptier yard

An order has been received for another 2 memorial benches, that means bench production has to swing back into action

Raw material cut for the first of the new batch of benches

With 3 deliveries going out this week, it seems that the threat of power cuts and gas shortages are starting to cause people to get their log orders in quickly. With wholesale gas prices rising 16% in the last week, logs are good alternative if a house has a fireplace or log burner. Prices for logs have been held steady so now is the time to order. Eastern Depot deliver to the Cirencester, Swindon, South Cotswolds and North Wilts area, a £10 charge is made for loads outside a 16 mile radius of the depot at Latton. To order your winter logs – before the economics of supply and demand kick in – contact the team via one of the four ways set out on the webpage at: https://www.cotswoldcanals.org.uk/support-us/log-sales/

Half load of Ash as delivered, stacking can be arranged for small donation

The forecast is for rain for next week, will that change the plans and put log production in jeopardy? Don’t miss next week’s thrilling instalment of the East End News

Latest News