East End Activities

Maintenance
Phase 2

East End Activities

by: Stuart H.

Week Ending – Monday 4 October

The Monday Summer Strimming Team (MSST) were out in the sun at South Cerney last week running up from Claymeadow Cutting to the River Churn finishing off that section for the year. This week it was a small team that met at Siddington Locks to do the final trim for the season. It was a cool start, with a heavy dew, but the forecast rain stayed away and the sun shone for most of the morning. 

The pound between top lock and number 2 at Siddington Bridge – What3Words: option.basically.diagram

Only two of the four locks are accessible, the top lock under the bridge is out of bounds and lock number four is partially underneath a house, the bulk of the structure being under the garden.

The pound between number 2 and number 3 locks after strimming

One of the interesting features still extant is the spill weir on the pound between locks two and three. This feeds a pipe round to the pound between three and four. The weir edge stones are a bit wiggly, but they are still in situ which is a marvel in itself.

The spill weir on the pound above lock three

The only visible remains of lock four is a line of stones in the path.

Is this all that’s left of Lock Four?

An even more depleted team will be at Northmoor Pound next week. It seems that September and October are the peak season for holidays amongst the retired volunteer community.

The view from the bridge on the way home

Eastern Depot

The depot activities last week seemed to revolve around log deliveries and production, not much of a change there then. Log sales have picked up, possibly the cooler weather has spurred customers into action.

Not sure if the log stacking service has been mentioned before, the team of dedicated customer focussed volunteers can neatly stack the delivery (for small additional donation). The logs are certified as “Ready to Burn” in line with the Air Quality (Domestic Solid Fuels Standards) (England) Regulations 2020, so it is best to keep them undercover if possible to stop the wet getting in.

Stacked delivery, all part of the service

Luckily, the log deliveries haven’t been caught up in the current fuel crisis, the vans were refuelled before the crisis broke. The burning question now is what’s going to be the next fuel crisis. Well, looking around the yard last week it was difficult to spot any timber waiting to go into the log production process. If anyone has any failing ash trees that need to be removed, contact the team.

The yard this week, with a diminishing log stock
Raw material stock in the yard in June

All the details needed to order logs are on the website at: https://www.cotswoldcanals.org.uk/support-us/log-sales/  There’s no need to panic buy logs yet, but Christmas Puddings and Turkeys, that might be a different story

Latest News