by: Stuart H.

There was more timber collection and log production at the depot on Tuesday and Thursday last week. Sorry there isn’t any photo evidence but the blogger was skiving off, it’s summer holidays after all

A small team met on Saturday 31st July at Weymoor Bridge to carry on with the site consolidation, this involved moving some stores around and removing building waste form the site.

Grab lorry loading rubble for removal and recycling

2nd August — The Monday team were back at Siddington Locks to give the site a proper haircut, the last visit was limited to 2 metre paths and safety zones around the lock tops. This time 2/3 of the site got the full treatment with the remainder left for next week.

Start point, cloudy, a respite from the recent heat
In around and below Lock 2 – What3Words kickbacks.dance.silence

There looks to have been a blame apportioning trial at morning break; it’s not clear if it was counsel for the defence pleading the case, or the prosecutor pointing out the alleged culprit

Who’s turn was it for the cakes?

The absence of sunshine was a boon, it made the work conditions a lot more comfortable. It’s always been a source of mystery why people will volunteer to work in all weathers, it’s not for the wages, that’s for sure.

Progress at the top end at close of play

The dreaded holiday season may interrupt reports for a while, hopefully followers of the blog will be able to wait for the next thrilling instalment.