The present job for the Landing Stages team is to build moorings along the on-side between the swing bridge and the road bridge at Ebley. It requires a new edge nominally 60cm above water level, 90cm wide, made by piling the edge, further strengthening with 1m ‘kingpiles’ sunk into the bank, backfilling with hardcore, and a surface topping like our standard towpath.

Access to the bank is quite difficult with a steep drop of about 1.5m, but progress has been quite straightforward for most of the length, using the piling frame. The tricky part was about 40m of the easternmost length, where the curve of the abutment to the flood gates prevented the barge from getting close in to the bank and in reach of the crane. As there is nowhere to turn our barge in practical distance, ingenious solutions were deployed!
The last few piles were placed ‘freehand’, and now that some remedial work to line and height has been done, the main piling is now finished. We hope this gives some relief to the residents, we are grateful for their patience and tolerance to our noise.

The on-side road bridge abutment is being raised with a row of Cotswold stone, and the front face of the moorings will be finished with Armco and fitted with mooring rings.