Monday saw the CCT teams descend on Harper Field in force!    First on the scene were the wet and dry dredging teams to offload the refurbished hydraulic cylinders for Augustus Gloop, with Les and the big digger providing the muscle to move these around.

The logging team then arrived to check out the stockpile in the field, and after the potentially saleable wood had been identified Andy and Steve moved the unwanted wood and brash to the bonfire pile with the help of the 6T dump truck, which part way through decided that it didn’t want to play and wouldn’t restart until Les waggled some wires when it magically restarted!

In the meantime, Frank and Roy with the tipper delivered some tread plates and GRP panels that had been donated to CCT, and Roy and his team then continued to work to move insulated roof panels donated from the Stroud Metal’s site to the field.  The plan is to use these panels to re-roof the woodwork and metalwork shops at Western Depot once they have been cut and prepared to the optimum size.  The team completed this task in time for a late lunch, and are probably pleased to see the end of this task!

The dredging teams continued the fit the (heavy!) refurbished cylinders onto Augustus Gloop, with some problems with pins and getting the cylinders and pipes in the right place, but by mid-afternoon the heavy lifting had been completed, and the team continued with reconnecting and commissioning the cylinders which hopefully will then give better performance across the full range of movement.

The afternoon saw Vince and his team with the red Transit turn up with multiple loads of Heras fencing panels, wood, road signs etc scavenged from another site.  By this time the log piles had been tidied into a more manageable state so that the wood and panels could be stored in something approaching an ordered state.    The team then decided to have a coffee break watching the dredging team doing their work – it’s always good to see someone else doing the work!

By the end of the day all the deliveries had been made, and the team then helped to finish cleaning up the log pile to make more space for whatever next has to be stored at Harper’s Field!  One of the next projects may be to build a better wood store at the site for the wood destined for the woodwork shop, especially as the current store at Western Depot needs to be moved before the workshop can be extended, but we do now seem to have a supply of wood to support this!