This week saw Dave, Jason, Kay, Frank and Steve tackle more of the potential landing stage in the field. We knew that it was muddy but were then told by a local expert that there were two spring in the field one of which appears to flow from the gravel layer under the clay, and was now visible in the area dug out for the landing stage.

The team decided to put in a drain for this, and in the process found a use for ~100 of the concrete blocks that had appeared at the bottom of the field. The pipe and blocks were then covered with clay and gravel to encourage the spring water to flow down the pipe and into the cut.

The rest of the area was still very wet and muddy so the team then started to use the spare rubble from the top of the field to provide an under-base for the type 1 and concrete specified for the loading bay itself.


This now leaves only ~1900 concrete blocks in the field – perhaps we need a “Concrete-blockometer” but I think that this will take longer to reduce to zero that the “Mincepie-ometer” which has now reached zero!
Work will continue on this next week by which point we may actually be able to stand on the area without getting booged down, and start to mark out what the outline and levels will be for the finished dock.
The Harper’s field hospitality unit saw good use this week with the Annette II team also joining us, and a new hosepipe based boot-wash system being implemented to resolve some of the mud problems!