John Robinson Lock Progress (finally!)

Phase 1B
Restoration

John Robinson Lock Progress (finally)

by: Jon P.

After what seems like ages, things are happening again at Westfield (Now John Robinson) Lock. There’s been little activity there since the end of 2023, as we tried to negotiate an access agreement with Ecotricity. Things have now been resolved and we hope to restart work on the lock and the associated Westfield Bridge as soon as possible. Taking advantage of the adjacent work to culvert the Oldbury Brook, we’ve been able to remove the north western bank that was blocking the entrance into the lock.

During the working days of the Stroudwater Navigation, the Oldbury Brook flowed into the canal and exited by means of the large spill weir opposite. When the canal was blocked off at this point, a new route was cut through the site to divert the Oldbury Brook down the western side of Meadow Mill. Westfield Lock and the canal beyond were infilled as part of the M5 construction around 1970, and the new route of the Oldbury Brook carved through the top end of the lock. We cleared out all of the infill within the lock chamber, but had to leave the bank of the brook intact to guard against potential flooding of the lock and land beyond. 

Now flooding is no longer possible, the ‘Oldbury Brook team’ (‘Scottish’ Andy, ‘BT’ Andy, Pat and Dave) have cleared the bank down to the original lock cill. This work was done using the large excavator already in use on the culvert build, but had to be done very carefully to protect the remains of the lock. 

It had been thought that all of the upper gate recess and a large section of the cill had been broken out in 1970, but it turns out there’s a lot more remaining. The gate recess has been reduced in height and no longer exists beyond the ground paddle location, but almost the entire brick (and timber) cill still remains. 

Other work with spades and shovels had previously exposed the truncated remains of the sloping ground paddle culvert, so we now know the full extent of the damage and the necessary work to carry out repairs. 

Working closely with the designer of the Oldbury Brook Culvert, we need to determine where we can position a new concrete foundation for the rebuilt southern upper gate recess, ground paddle culvert, and the missing corner of the cill. 

The replacement masonry will be a ‘mirror image’ of the intact opposite side of the lock. This will then merge with the new canal channel which will be built over the culverted Oldbury Brook. Some of this work will be done by the Tuesday and Thursday volunteers, but it is also hoped that visiting volunteers from the Waterway Recovery Group will work on JR Lock this summer.