Where is Westfield Lock or, more importantly, where has it been hiding? And what is John Robinson Lock? Read on!
When the M5 was built in the early 1970’s, it was deemed necessary to fill in the canal channel from Westfield Bridge to the A38 (the Missing Mile), and this work also included terminating the remaining canal eastwards, re-routeing the Oldbury Brook, and infilling Westfield Lock. As is well known, Westfield Bridge was only saved by the determination of the land owner’s daughter. The new route of the Oldbury Brook was achieved by destroying the top end of Westfield Lock, possibly by using explosives. The lock then lay hidden for the next 50 years under the surface of a field.
It has been agreed that the restoration of Westfield Lock and the adjoining new Oldbury Brook Aqueduct will be undertaken by the volunteers of the Waterway Recovery Group. Over the three days from 21 to 23 October, volunteers from Newbury Working Party Group (NWPG) came to the Cotswolds to help locate the remains of Westfield Lock (just east of Westfield Bridge). Over this long weekend, the tops of the lock walls emerged again from the ground (as they had 6 years earlier, before Ecotricity made us fill it in again!). Using just spades, shovels and mattocks they dug down 300mm on the inside of the walls to help determine the overall condition of the lock.

Meanwhile, Pete B used the CCT mini excavator to start digging out under the bridge, which also revealed a couple of coping stones thrown in with the spoil. At the top end of the lock, the entire gate recess, ground paddle culvert, and wing wall were missing on the south east side, but all of the north east side remained. This also revealed the tell-tale signs of the demolition having been done by a large excavator, as the bucket teeth marks are clearly visible in the remains of the brickwork. Graham battled away with a spade and mattock to try and locate the remains of a bypass spill weir, following clues in a late 1960’s photo of the lock.

This was as far as we were able to go on this occasion, but we now had plans for a repeat visit the following month.
Despite a poor weather forecast, NWPG returned for the weekend 19/20 November. This time we’d assembled the heavy plant – an 8 tonne excavator and two 6 tonne dumpers – all kindly supplied by our friends at Plantforce free of charge. We had decided that coming into the site under the bridge would be difficult owing to the steep slopes necessary to get under the arch, so we made an access route in from the north side of the lock. Initially we started digging back eastwards from the bridge, with the excavator sitting about 5m above the base of the lock.

Most of this work was carried out by Dave Evans, visiting Restoration Supervisor from the Wey & Arun Canal Trust. The two dumpers plied back and forth, delivering the spoil to a fenced-off compound on the first 100m of the Missing Mile. At this point we realised that the lock chamber coping stones had all been tossed into the bottom, possibly to achieve a better graded site after infilling. We currently have a pile of around 20 coping stones, including two of the specially shaped hinge quoin stones, most of which can be re-used.

On the Sunday, we switched attention to the eastern end of the lock, working back from a retained bund against the Oldbury Brook cutting. Gradually the remains of the north eastern side of the lock cill started to reappear from the spoil.

By lunchtime we’d exposed the timber mitre for the gates, but the 10” x 12” timbers hadn’t fared that well from being buried for over 50 years. At the end of the day, the working excavated face had moved back about 7m into the lock.

With the plant due to be collected on the Tuesday, we thought that it might be possible to get another day’s digging done at the lock. Monday, however, turned out to be heavy rain all day. The local volunteers were reluctant to turn out, so it was left to Duncan and I to clear some random spoil heaps and reduce the height of the infill by another metre or so. This has left us with an access route and a gently ramped top surface, which means we can dig much closer to the bottom of the lock. We gave up round lunchtime, as the route to the spoil storage area was rapidly turning into a resemblance to the Somme.
Despite the awful weather, we had a visit from Terry Robinson and friends. The Robinson family has made a generous donation to CCT in memory of John Robinson, but this fund is restricted to the restoration of Westfield Lock. With luck, this money will cover the restoration of the structure and pay for new lock gates, paddle gear and lock ladders. For that reason, the lock will henceforth be known as John Robinson Lock. This will lead out under the original Westfield Bridge, then turn hard left onto the Missing Mile and eventually arrive at Westfield New Lock, which will drop the canal to the required level to pass under the M5 river bridge.
We now need to arrange a further 2 or 3 days’ work with similar plant, as we’re still only about halfway through completely emptying the lock structure. Present indications are that the remains of the lock are in remarkably good condition and that restoration will be no more difficult than any other Phase 1A or 1B lock. The complication of the missing south east section of the head of the lock will be resolved by incorporating it into the concrete channel forming the new Oldbury Brook Aqueduct, thus linking in to the existing canal up the Eastington flight of locks.