Missing Mile October Update

Mud, mud glorious mud, there is mothing quite like it…
By Andy T.
We all know the next line, unfortunately I couldn’t come up with a rhyme that was appropriate for our situation.
We have in the last week or so gone from where the ground was so hard and dry with the machinery at times struggling to break it, to a situation where the wet clay and subsoil just stuck in the excavator buckets. Just one of the many challenges we have had to deal with.
We have now dug approx. 500m of the new canal route. Progress on the pound, nearest John Robinson lock, has been delayed by the archaeologists undertaking a controlled dig.
Fortunately, they have now finished but placed us under caveats which we must work within. Our main aim, prior to discovering the archaeology, was to discover the depth and extent of the gravel bed on the route of the canal so that it can be dug out and the section lined with blue clay. We now have to do this under archaeological supervision which will significantly slow us down. Hopefully we will start this in the next month, weather permitting.
The main area of focus has been on digging Lower Westfield lock. This hole is approximately 35 metre long, in places 16m wide and 3 metres deep. Moving the material and shaping the banks, to prevent slippage has been a challenge.

As we have progressed, management of the water levels has required the creation of sumps and installation of pumps. This is due to us being below the level of the water table. Currently two pumps are in place, working on a float switch, which control the water level and automatically kicks the pump into action when required. Initially the pump was running for 5-10 minutes every hour, however, since the recent storms they have been running at twice this rate.
The water cannot be pumped into the river, to comply with environment agency guidance, so must be pumped into a settling pond. Fortunately, the previously completed section has turned onto the ideal water storage facility. As it fills it gives a feel for how the future canal will look.

The lock dig is nearly complete. The bottom needs to be levelled and two semi-permanent drains will be installed. These will be the full length of the lock to keep the area dry during the next stages of construction.

As access across the site is becoming more challenging we will now focus on the canal basin at John Robinson Lock, along with the creation of an access road and storage area for the concrete mixers and materials needed to build the new lock.