New Gates for Old?

Maintenance

New Gates for Old?

by: Will F.

Although being only 10 years old the lower set of lock gates at Ryford have been leaking for some time…and this despite Frank L’s valiant attempts to seal the cracks with hemp, (caulked not smoked). So with a budget kindly provided by SVCC, a set of new oak planks with rebate for sealing were purchased from Timberpride at Tetbury with the aim of replacing the uppermost half of the lower gates…the part that gets most damage through alternate exposure to water and sun.

With help from Wookey Hole crew and the boat team we progressed from Harpers Field on Monday and secured the preassembled triangular AquaDock as a working platform with Jasper and Wookey providing storage and access.

We first had to remove the tenon steel support plates and long 20mm bolts…all but one came loose though a couple needed persuasion with a length of scaffold pipe! The bolts have a smooth flat head and a curious 45deg chamfer on the downstream side, possibly with a thin washer to assist grip when tightened into the steel plates.

Cutting through the 2 inch thick oak planks was OK, the problem was removing the 6mm dia ribbed nails…8 per plank! We broke the supposed “forged” (forgery?) nail extractor! There was nothing else but to keep cutting above and below the line of nails and remove the damaged planks in bits and pieces.

We started cutting the new oak lengths in the break after the rain and checked they fitted. Wednesday saw the plate routing completed and with a coat of bitumen paint on the end and a rubber strip attached to the rebate in the planks….the 20mm bolts though were again a pain to tighten with only a chamfer to grip. The thunder and hailstorm necessitated an extended lunch break and we turned off all the electric supply! By close of play the first 4 planks were firmly affixed, and we called it a wet day!