New Sponsored Bollards

Events
Phase 1B

New Sponsored Bollards

by: Peter A.

Three new Bollards, destined for Phase 1B, are in the process of manufacture. Taken from our strategic reserve stock of CCT designed castings, each has a cavity milled in the top by a local engineering company to take a brass plate.

Preparation involves giving each one a thorough rub down/de-rust before painting. A white line around the top provides a token hi-vis when viewed side on.

Here, the masking tape is being removed to reveal the white band. In a few weeks, the brass plates should appear from the foundry and then they can be completed ready for installation in the future.

Latest News