Newtown Lock July 2023

by: Andy P.

Well, after a further 4 months of ’deliberations’ we were allowed to use our original suggestion of the Portadam, which had been successfully used at 2 other locks. The reason we could not use it several years ago was due to the uneven silt layer. This was easily sorted after a further survey. Chris’s newish JCB has been used extensively already in other areas and was brought out to do a different sort of digging. Under the direction of Tom Inthewater, the silt was quickly moved and evened out.

The crowd watched on in eager anticipation

It was not long before the frame was built and the tarpaulin stretched across and down into the water. The water behind the dam was very slowly released to check if the seals had worked. Of course they did. We can now, at long last, see the off side wing wall-not pretty though.

We ran out of time to start the lower dam so on weds the OnSite team returned to construct the other dam. The pound had to be lowered to allow the team to get into the water to construct the frame work. This was completed relatively quickly and the top dam signed off as it was still intact after 2 days.. The tarpaulin was not fitted as we still have not got approval to do any work in the chamber!

The infamous airbricks that have caused so much consternation are visible as green patches along both sides of the chamber wall. Bets are being taken as to what lies behind them.

Chris and his JCB were brought back into use to help clear the metre of silt behind the dam and the lock gates. Where would we be without this invaluable help? It couldn’t reach all the way across so we had to hand shovel the rest into the bucket-that was hard work.

The old cill appeared and we are hoping it can be smoothed out and reused. Mainly because taking it out will take an awful lot of work.

Scaffolding and a bridge were erected on both sides, so the brickwork, especially on the offside could be assessed. It’s not good. Most of it came out by hand which meant the top newer repairs had to be cut out from above. A lot of brickwork to rebuild and large coping stones to be relocated.

The first of the stop plank channels was fitted as new brick work will be laid up to it

The paddle gear was cleaned off and inspected. It looked in good condition and will be leak tested when the walls are repaired.