Recently the chippies have been making a prototype of the ground paddles that will be used on Phase 1B. (For the uninitiated these are the shutters that let water in and out of the lock, and are wound up and down through gearing attached to posts on the lockside). Rick in the machine shop has been busy making the metal parts.
During construction of the prototype three things became obvious to the chippies:
1. Some of the components are quite heavy
2. The fully-assembled paddle is seriously heavy
3. We’ve at least 17 more of these to make!
Some rapid measuring revealed that the main work table and the working platforms of the drilling machine, table saw and band saw were almost the same height above the floor. So, if we had a means of transport at that height between these we could save ourselves a great deal of heavy lifting. I.e. what we needed was a heavy-duty ‘tea trolley’.

Being carpenters, we set up to make one out of wood, re-purposing some of Reg.G’s old kitchen work surface and acquiring a set of heavy-duty castors. It works brilliantly, and when Phase 1B work is done we can put our tea and coffee mugs on it.