Passage to the Ocean Rail bridge

Phase 1B
Restoration

Passage to the Ocean Rail bridge

by: Chris K

We ventured towards getting under the Ocean rail bridge today after taking depth measurements beforehand using the little white dinghy. Depth measurements of 1.1 metre through the lily area ,1.9 metre through the new ocean hard bottom rebuilt length.

The 1.9 metre depth is to just 40 metres short of Hoffman’s dam concrete wall. Although the channel through Hoffman’s dam is 0.75 metre.


The swing bridge worked perfectly.


Unfortunately we got stuck just short of the Rail bridge and had to be pulled out by Tug Margaret.

 
Hopefully we return next week to dredge out the lily root obstruction. 

Looking back from Hoffmans dam
Successful return

Latest News