Phase 1B Dredging

Phase 1B
Restoration

Phase 1B Dredging

by: Frank L.

Last week Andy and I were tasked to meet Mike D. the Ecologist who is overseeing the moving of the water voles from Bonds Mill. I believe 2 were caught prior to our arrival and transferred East of the Ocean Swing Bridge, so the bank can be piled by Bonds Mill lift bridge to prevent the increase in leakage down the embankment. Initially we used the mini digger, last week, to dredge upto the bank and remove at least a metre of all vegetation from the water line to a metre back from the edge. The distance we had to clear was about 120 metres.

What we didn’t complete on the Monday was completed on Tuesday by Ian M. and other volunteers. We returned today at Mike’s request to complete the profile of the edging prior to the piling barge arriving on site.

This was achieved, so we wrapped up and returned to WD to see the monster excavator in action above and below Dock Lock.

Weighing in at 30 tons, with a 20 metre reach is very impressive, and is currently being used by contractors to clear the bed of the canal down to Oldbury Brook near John Robinson Lock.

This sort of machine is what we would need to deal with the missing mile. Trust Council please note.