Pictorial history of Tool Store Raising

Maintenance

Pictorial history of a Barn Tool Store Raising

by: Vince H.

15th February

Slab laid and Door posts installed (Photo credit Andy P.)

23rd February

26th February

Purlins and noggins going in.

1st March

Door installed. Remaining purlins and noggins completed.

2nd March

Purlin end plate installed. Roof panels going in.

3rd March

Roof completed. Side wall battens installed. Electrics going in.

5th March

Side wall panels being installed.

8th March

Door frame in progress.

9th March

More of the left wall installed. Racking for storage installed.

10th March

Left hand wall complete. Everyone trying to ignore the tricky bit to the left of the door.

12th March

Front wall completed – apart from the bit to the left of the door.

15th March

Graffiti removed. This was easier than the bit of wall to the left of the door. There is graffiti on the inside of both doors, but it is a much better effort and will be kept.

`17th March

What tricky bit? Garden machinery waiting to go in.