Project Dredgersaurus – Big bits go back on

Maintenance
Phase 1B

Project Dredgersaurus – Big bits go back on

by: Peter A.

We’ve continued working towards getting ready to reinstate the engine into Hamster and this week it happened! With the engine room cabin painted inside and primed outside, the engine bay interior decorated and availability of the HIAB to do the lift, we did the deed.

The engine went in first. There should be four securing bolts, but only three were in place when we received the boat. Some attention is required to the mounting method to ensure it will not come loose. Fuel pipes and throttle cables are in place and relatively easy to connect up, however, the electrical installation needs a complete refit to tidy it up and ensure reliability. With the engine room cover on, it becomes and inside job!

A number of small jobs are work in progress. Namely the cabin doors and hinged hatch covers. Visually, it is something of a step change when major components are replaced.

Up at the bow end, we have now drilled the two holes required to bring through the hydraulic feeds for the bucket rotator function. When these parts arrive, we will be able to get the hydraulic plumbing completed on the JCB boom. The bulkhead plate is extremely thick, so demanded the services of the mag’ drill and frequent doses of cutting fluid.