Project Dredgersaurus – Our Hamster can now bite!

Project Dredgersaurus – Our Hamster can now bite!
by: Peter A.
The final major milestone was achieved this week, that of completing the hydraulic connection to the cam shell / rotator assembly. This has taken some time to ensure that the pipes behave correctly when exercised through to their limits of movement, which are often well outside the normal dredging actions.

During this phase, there has been plenty of progress in a number of areas. The electrical fit is progressing, especially in the engine room and facilities cabin. We now have the gas, water and waste plumbed in. A new lockable gas bottle holder now resides outside the Facilities Cabin door.

Under the Control Cabin floor has been fitted the new diesel heater. It’s taken some head scratching to work out how the hot air will be ducted and this has resulted in a new woodern box arangement around the control levers. Easy access for inspection of hydraulic pipes has been included.

On Monday, we invited a number of dredger operators along to crawl over the boat and provide feedback on anything we have missed or needs adjustment. From this, we will be fitting the same leg rotation method as Patricia and also installing cleats along the gunwales to aid the control of mud hoppers.
Today, the JCB boom received some paint and now shines brightly. There is much more to paint, but we have had great difficulty progressing this due to the weather and trying to get surfaces dry.

Our nominal peoject completion date is the end of March. We have a number of small jobs, mainly fixtures and fittings the decorating to complete and of course, getting the all important BSS Certificate.