From 08:30, gradually, a large team assembled on site to set about the substantial task of moving Annette II to Dudbridge Wharf. Monday’s progress took us as far as a large silt bank across the canal just downstream of the bridge, where Annette landed firmly and would go no further.
Today, discussions centred around any and all methods available to us to get Annette moved. She could not be towed over the bank, so a large Tirfor winch was deployed. Fortunately, we had some sizable tree trunks within reach of the steel rope from which to pull. Each swing of the Tirfor lever moved the rope just 20 -30 millimetres. As before, pumping was required to shift water out of the cabin, but now it was much easier in that the stern had not sunk deep into the water. Soon, we had reached a stage where the cabin doors could be opened.

The Tirfor was deployed for a period of time sufficient to get Annette on top of the silt bar. We could see her level off a bit as this happened. So, time to get the first tug attached and go for a pull. Whilst there were moments of slight success, just very short forward movements, the tug alone could not sustain a continuous pull. Reinforcements were called in and some time was spent experimenting with a two tug combo. This proved to be no more satisfactory and tended to complicate matters a bit.

Now, today is Wednesday and this sunken boat has to be in position by Friday. We knew that there was time to winch it all the way, however, we also knew that Margarete did, at times, manage to do the drag alone. So, with the Tirfor deployed to the next reachable tree trunk base and the tug giving it full beans, Annette slowly inched her way along the canal. There were the odd moments when a drag of a metre or two happened, accompanied with much cheering and jollity!


By now, there appeared to be no more water entering the cabin, so the pumps were stood down. Once Annette made final approach to the wharf, the tug was removed and she was hauled with the Tirfor against the cast iron base of the original (heritage) wharf crane as the anchor point sufficiently close to enable safe boarding on Friday.

Friday is going to be a very busy day. We have trip boat ‘Endeavor’ being lifted into the canal having completed its duties at Saul Junction for now. Around lunch time, the Hereford and Gloucester Canal Trust’s 70ft hopper will be arriving to also be lifted in and then we have the job of lifting Annette to a point where we can pump and clean out her bilges so that she will float once again. The forecast is good. We were also able to have a detailed chat directly with Ellis Cranes, who will be undertaking the lifts, explaining our plans to them. They commented that they particularly enjoy working with the CCT as we present challenges far removed from the run of the mill roof truss and facility cabin jobs.

Everyone involved today made a fantastic effort to help with this stage of Annette’s recovery and we should be proud of our success and that it was carried out safely. Thank you All. A small matter of ‘Community Engagement’. We noticed that the management and workshop staff of the Peugeot Garage, besides the canal, had their noses pressed to the windows, following our trials and tribulations. Soon after we passed by, written in white aerosol cleaner foam on a window were the words ‘Well Done‘