Random Jobs – Phase 1B

Random Jobs – Phase 1B
by: Andy P.
Fromebridge
Mid January 2023 the construction teams were sent to Fromebridge in order to fence and gate off the 4 rhyne crossings. The herd of young cows were extremely interested in what we were doing and used anything as scratching material.


The vehicles found the going very slippy and at one point the tipper nearly went for a wash in the water. The land in the picture and running alongside the canal will be used to provide wildlife ponds and scrapes at some point in the future.


On subsequent visits the cows always came to give us moral support whilst we bored holes and fitted the posts and gates.


Tonnes of stone had to be transferred from Highfields by dumper and laid across each bridge




Several rescue attempts had to be made to extract vehicles.
Langleys Field
Another land purchase to be used for canal dredgings. Several solicitors failed legal attempts were made before the final hand over. In the meantime, the circuitous boundary line was agreed with the 2 land owners and a start made to erect a fence. Not so easy when the field was an old tip.



