The Last Step…..

Phase 1B
Restoration

The Last Step in the Refurbishment of Western Depot?

by: Buffs

The small but growing band of Thursday volunteers had done their bit for the concreting of the middle yard. Pink type one hard core now covered the ground once known as the lily pond. The multi-coloured and textured ground was levelled and wackered into place. Five sections to be filled were defined by wood and steel retainers. Two to be filled on Monday and the rest to be completed on Wednesday.

(The pink is probably not Type 1 ballast!)

The concreting team was forming up as the Monday team signed in. Final levels were confirmed. The powered concrete polisher was assembled and tested with a roar from the ‘small engine’ driven vibrator. Procedures were discussed and walked through. And then… the waiting began. As minutes swept by the group decamped for tea and biscuits. And then a second cup.

A shout! “It’s here!”.  But the mixer wagon had turned towards Pike Lock Slip. Recaptured by one of the team the wagon backed onto Spring Hill, went around the roundabout and eventually returned to WD. The assembled team were waiting tools in hand; shovels, rakes and wheelbarrows at the ready. And they’re off. Concrete slid down the chute and into barrows to be whisked away to the end of the section where it was worked into place. Quickly the level rose to the mark. Once a rough level was established by raking and shovelling and the mark one eyeball a wooden beam was laid between the edging and with a sawing action a pair of volunteers under the watchful guidance of ‘Chris the Farmer’ the wet concrete was worked into a plane level. Working up the slope smoothed concrete emerged from the rough tide swept beach like form of the first lay. The yard rang with calls of “a bit more here” and “it’s building up in front, scrape it away”. The sawing went on up the slope with the pairs on the scraper beam being changed as old knees rebelled against the load being forced on them. Soon the section was filled from the bottom of the slope to the top.

Onto the second of the day’s sections and the work started again but just a smattering of concrete was left in the drum. Time for lunch in the sun!

A phone call announced the pending arrival of the second load of the day. The team, refreshed by lunch, set to work again in the second section working up the slope. The earlier experience was put to work and the section was filled and levelled with fewer shouts and more anticipation and of where things were needed.

Job for today complete the tools were washed clean of the cement and returned to store. And a big “Thank You” from Steve P and Chris the Farmer.

Wednesday came and the volunteers were ready for the next three sections to be filled. Anticipation was muted when the delivery was called for the Afternoon. The steel dividers were removed and returned whence they came. An early lunch was taken and the waiting commenced and went on and on and on. The number of volunteers fell as home beckoned. Reg emerged from the Office. “It’ll be here by 16:00-(honest)” he said.

It was a much diminished cohort of volunteers who were there to greet the wagon as it backed through the gate. Setting to work the team quietly worked the concrete into the slim section by the fabrication shop. This section is the most complex of the 5 as it has a twist and a slope in two directions. The fourth section in front of the wood store is much more regular and was filled and levelled quite quickly; and then the concrete ran out. The estimate of the volume was a little awry as the undulating floor of the lily pond absorbed more concrete than was expected.

The job was finished by 18:00 with tools washed and locked away. With barely a look back the volunteers left the yard for home and supper.

Come the next Monday when we signed on we had the first sight of the newly laid concrete. Seeing the seemingly wide expanse of the yard shining in its new concrete coat many volunteers were brought to a halt. Not quite wide eyed but more with a sense of satisfaction for a job well done. For most of the WD volunteers it was the first time they had seen a smooth surface at the heart of the yard. Among the quips were comments about the new “dance floor” and when will the “hoe down be held”. Slightly more cynical was the question “how long before we can’t see the concrete?” Other comments were made but I can’t repeat them here.

The small square by the long box needs to be laid but timing depends on our place in the queue for ready mix. 