The Lull before the storm

Phase 1B
Restoration

The Lull before the storm

by: Andy J.

A calm spell on the canal this morning prior to loading a large generator and fuel cube  onto Delilah and on Monday the barge will be positioned close to Ryeford lock. These items will power the submersible pumps that form part of the water level control for the Ocean bridge works.

Latest News