Unless you have escaped the country of late, you will have probably noticed that there has been quite a bit of rain of late. The consequence of all this precipitation was that our weed cutting boat sank quietly on its mooring above Wallbridge Lock. The canal is quite deep here and little showed above the water line.

The BAT Squad (Now rebranded as BRAT Squad….Boat Recovery and Acquisition Team) volunteered to undertake the recovery of the craft. A site inspection was undertaken to quantify the challenges this task were to present to us. There are four lifting lugs on the gunwales of Weedie, but all too deep to reach without surgical arm extensions or potential drowning!

So, it was time to call again on our friendly Stroud Valley Sub Aqua Club to come and assist. They are only too keen to actually do ‘real’ work in ‘real’ dirty water rather than a heated swimming pool!

A planning meeting identified the methods, risks and equipment we were were to use to rescue the craft. Equipment from Western Depot was brought along and loaded onto the AquaDock floating platform which was placed in the Wallbridge Upper Lock and then floated across to the work site.

This was Day 1 and preparations for the lift got going with our Diver Paul getting his kit on, then heading down to attach chains and shackles to the lifting lugs on Weedie. With every splash, the visibility progressively deteriorated.

Before long, however, Paul was ascending a ladder slowly descending into the mud, job done.

We had selected two long square section steel beams from which to attempt the lift. Our initial ideas were to use a Tirfor winch and pully system. The weight of the the craft was estimated between 2 & 3 Tonnes, quite a load. One issue with which we had to wrestle, was that the floating AquaDoc displaces and equal amount of water to the lifting load. So, it has to sink as you winch, a bit self defeating. It also flexes, but does make a great platform from which to work. The other end of the beam(s) sat on the more stable wharf side. Great care was taken to ensure loads were applied to points of substantial support.

Whilst the Tirfor was capable of doing the lift, we had restrictions to the amount of lift distance and the difficulty of setting a new lift arrangement to achieve gunwales out of water. A rethink was required. We decided to move to a two beam lift arrangement with jacks deployed at ‘ground’ level. All the jacks and a large selection of lumpy pieces of wood were scrounged from WD and delivered to site on Tuesday, ready for yesterday (Wednesday).

Progress was measurable! Lifting took place at both ends of the beams. Each time the chains required resetting, it was two steps forward, one back, but we were winning. Slowly Weedie broke the surface and reached the point were we were able to get the gunwales just above the water.

It was on the chimes of 3 o’clock yesterday that the pump was fired up and water flowed out. As the minutes ticked by, our AquaDock load reduced, the chains began to slacken and Weedie was able to float on her own. The engine room lid was lifted and that area pumped out, then she was fully afloat. It was reassuring that there was only a tiny amount of oil based pollutant released, which was caught.

Now, quite late in the day, we cleared the site and prepared all the equipment for returning to WD ready for collection next week.

This 3 day recovery operation has presented many difficult challenges. Thanks to our team and Paul from Stroud Valley Sub Aqua Club for all their support in the successful execution of this task.