Western Depot Interceptor
Maintenance
Western Depot Interceptor
by: Andy P.
Due to the current virus restrictions progress has been slow. Previously we managed to get the oil and silt interceptor into a very large hole at the back of the Marley engineers shop and made it level. Lots of hand mixed concrete made it stay in place. However the water table and heavy rain conspired to make the site a suitable quagmire. We started the drainage connections into and out of the tank. The push fit connections just didn’t want to be push fitted but eventually the rubber mallet won.
Then we had to dig up a channel by the side of the old barn, lay more pipe, fit another drain and just for good measure mix and lay more concrete. You can get too much of a good thing.






