Western Depot update work…

Western Depot update work restarts
by: Steve P. & Peter A.
Wednesday last week saw the teams return to Western Depot after the second lockdown, and work on the depot quickly restarted. Having moved out the old office container Reg decided that yet more trenches and ducting were required for services to the welfare unit before this could be moved to its new site. Frank on the digger supported by Fod and Neil soon made short work of this, digging up the hardcore that had been placed in the hole the previous week!

The team working on the barn decided to see if the roller shutter door would actually fit in the new steelwork, but without forklift support in the morning deciding how to safely lift the door roller drum into place took some time. A scheme was devised and with the help of ropes, ladders and scaffolding the drum was hoisted into place (and did fit!) and secured after which the drive motor and manual chain driver were fitted allowing the spring inside the tube to be pre-tensioned before the slats were fitted.

After lunch, with Jeff now supporting on the forklift, the slats were lifted into place and wound onto the drum after which the guide rails could be fitted and the door tested out – this showed some sticking problems so we weren’t able to shut the door at going home time!

Monday saw the team continue to work on the steel frame with the centre cross beam and uprights being fitted and temporarily secured ready for the rafters to be installed once Reg and Martin had ordered these. Mike and Chris continued to fabricate the components as we needed them, and you can now see the shape that the new barn will take.

Wednesday saw the team back in, but surprised to see that the welfare unit had already been moved by Reg and team on Tuesday, and that the centre of the barn was now filled by a large water separator intended to process the groundwater from the site before it can be safely discharged. Although we had known in outline the size of this unit it seemed much bigger in real life; after some careful (?!!) forklift handing the unit was moved out of the barn and work continued on the steel frame and 3rd front upright foundations.


Bob A and Andy were also surprised by the size of the separator tank, but after some head scratching devised a cunning plan on how to dig a 2.5m deep hole with a mini-digger that didn’t have the required reach. The plan was then put into place using the mini digger at towpath level to dig from above down to towpath level and then down to the required depth, and by the end of the day a large hole had been dug.


Next week will see the moment of truth when we find out if the tank will fit, and if the barn roof beams that have now been ordered will actually fit to the steelwork to support the new (to us!) roof sheets.
Elsewhere in the yard, it was determined that the shade of green of the slime on the side of facilities caravan did not quite meet the RAL spec’ for the CCT brand, so a quick brush up (or is that down?), restored the original colour. The side up against the long container has suffered worse.

Next door sat the new portable meeting room (container), which had received a clean and a covering of red oxide a week or so ago. Conditions were just about good enough to apply ‘real’ CCT green, so that now looks far more handsome than it did.

We’re getting there!