“What have the SDC Tuesday and Thursday volunteers been up to recently?” – I hear you ask! Well, a lot of varied tasks have been completed over the past months.

On two occasions, spaced out by over a fortnight while we waited for drier weather, we took the mini digger in to Gough’s Orchard to widen and deepen the channel between the Lock and Canal Ironworks. This was at the request of SVCC and the Gough’s Orchard Syphon Feeder team, as it had been decided that lowering the water level in the Lock by about 600mm would enable the syphon to work properly. Sure enough, as we completed the task and the water level fell in the Lock, the syphon kicked into action (finally!). Reports suggest that the canal down to Stroud has never looked so full.

We took Flea down to Ebley and worked from Oil Mills Bridge along Ebley Wharf and on through Hilly Orchard Bridge to reach Dudbridge Wharf. The idea was to clear the canal bank down to water level, where the tractor and flail can’t reach. We also scraped back the weeds to reveal a 2m wide towpath again.

After that, we were tasked with some tasks at Wallbridge. Some ‘little darlings’ had smashed up one of the picnic benches above the old Brewery Wall, then ripped up the fence along the edge, finally throwing everything into the canal. Another picnic bench had been lowered onto the ledge, so they could gather out of sight of the public and CCTV. Everything was retrieved from the ledge and Wallbridge Lower Lock, then the fence was repaired and repainted. This area has also been enhanced by the addition of bike racks courtesy of Stroud Town Council.

The new proprietors of the Upper Lock Café have installed new picnic benches on the lock side, but in discussion with SVCC, it was decided that the benches were too obstructive for operational boat traffic. The volunteers were asked to help and we determined that by removing one flower bed below the café, a patio could be constructed to position the benches much further back from the lock edge. The patio used some concrete pavers that had been stored at Brimscombe Port for several years, so the only cost was some materials from the Towpath stockpile, plus some sand.

Work now switches to trying to work out why the towpath side bottom gate at Wallbridge Lower Lock lets a lock-full of water to leak out in less than an hour. Monday saw the Dredger team led by Andrew Rendell use Augustus Gloop, a.k.a. Dredger No. 5 to insert the stop planks below the lock. The Tuesday volunteers than draped a tarpaulin over the stop planks, inserted the stop planks above the lock, and started the 4” Godwin pump. Let’s see what we find!